BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//7.2.3.1//EN
BEGIN:VEVENT
UID:212@vabonline.com
DTSTART;TZID=America/New_York:20200710T000000
DTEND;TZID=America/New_York:20200710T000000
DTSTAMP:20200220T164138Z
URL:https://www.vabonline.com/events/transition-progress-reports-due-for-c
 ertain-full-power-and-class-a-tv-stations-7/
SUMMARY:Transition Progress Reports Due for Certain Full Power and Class A 
 TV Stations
DESCRIPTION:\n\n\nFull power and Class A transitioning stations that are ch
 anging channels in the post-auction transition are required to file a Form
  2100\, Schedule 387 Transition Progress Report on a quarterly basis by th
 e tenth day following the end of each quarter (and if the 10th falls on a 
 weekend or holiday\, then by the first business day after the 10th).  Tra
 nsition Progress Reports must provide information regarding steps stations
  have taken toward construction of their post-auction facilities and must 
 continue to be filed until the filing station has (i) completed constructi
 ng its post-repack facilities\, (ii) ceased operating on its pre-auction c
 hannel\, and (iii) reported the foregoing to the FCC.\n\n \n\n\n
CATEGORIES:Regulatory Calendar
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/New_York
X-LIC-LOCATION:America/New_York
BEGIN:DAYLIGHT
DTSTART:20200308T030000
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR